Planning Tool / Event Production

Event Power Planner

Add the estimated connected loads for major AV systems, then apply planning headroom and view an idealised current estimate.

LEDLightingAudioVideoPower load

02 / Visualise

Where the load is coming from.

Relative connected load by category

—

03 / Estimate

Planning load.

Connected load—Sum of entered loads
Planning load—Including headroom
Idealised current—Based on selected supply
Supply reference—Planning reference
Largest category—Connected load
Headroom—Applied to total load

Power summary

A rough load picture before electrical design.

This planner helps production teams communicate approximate load. It is not a distribution-board, cable, protection or generator-sizing tool.

Discuss with MSAV
Connected load
—
Planning load
—
Current estimate
—
Supply
—
Headroom
—

Planning estimate only. The calculation is simplified and does not include power factor, diversity, inrush, phase balancing, cable sizing, protection, earthing, generator behaviour or local electrical requirements. Final temporary power and distribution must be designed and verified by qualified personnel.

Power notes

Useful for load conversations, not final electrical design.

Why add planning headroom?

Real systems can have startup behaviour, changing content, added equipment and operational variation. Headroom helps keep an early estimate from being based on the exact connected-load total.

Is the current figure a circuit recommendation?

No. It is only an idealised current calculation from the planning load and selected voltage/phase reference.

Can I size a generator from this result?

No. Generator and temporary-distribution design requires additional electrical information and qualified review.

Event production

Need to plan the complete production system?

MSAV can coordinate the AV equipment requirements with the venue and qualified electrical team.
Talk to Our AV Team